Hourly or fixed price, for freelancers

Bill by the hour or quote a price. Phased works either way.

Phased is time and project tracking for freelancers, however you price the work. Bill by the hour with no budget, or set a fixed price and see what it pays per hour. Keep a small job as one simple project, or split a bigger one into phases and tasks.

30-day Pro trial · No credit card

Three jobs, set up three ways. The product renders are split into phases with a price on each. The website copy has one fixed price. The advisory calls are hourly with no budget, so they show no budget health.

Freelancers rarely price every job the same way.

A consultant bills advisory calls by the hour. A copywriter quotes one price for a website. A 3D artist splits a product launch into modelling, lighting and final renders. Sometimes that is the same person in the same month.

Counting hours alone does not tell you whether a fixed price paid off. Splitting a fee into parts does not help with work you bill by the hour. A tool built for one way of pricing makes the other ways awkward.

Bill by the hour, with no budget.

A project with no budget is an hourly project. Its value is the hours you log multiplied by your rate. The calendar adds up the value of the week as you log time. The advisory calls above have 9h 30m logged at €70, which is €665 of work.

A project with no budget cannot go over budget, so it shows no budget health. If you want a limit, add an hours budget. Phased then shows the hours left.

This week 24h 45m €1,527.50 at your rate
Nova Rebrand 10h Loft renovation 7h Hillside House 6h 30m Studio Admin 1h 15m

Quote a fixed price and see what it pays per hour.

Give a project or a phase a money budget. That budget is the price. Phased divides the price by the hours you log on the agreed work, and the result is your effective rate. The website copy above was quoted at €1,400, which is 20 hours at €70. After 14 hours, it pays €100 an hour.

Lighting & materials is the opposite case. It was planned at 30 hours and has taken 35, so its €2,100 price now pays €60 an hour. Budget health is On track below 80% of the budget, Approaching from 80% to 100%, and Over budget above 100%. A budget only warns you. It never stops you logging time.

How Phased calculates budget use and hourly earnings

Keep a job simple, or split it into phases.

A simple project is one job with one price, or with no price. Phased keeps the whole job in one hidden phase, so you have nothing extra to set up.

If a job has separate parts, split it into phases. You name each phase and give it part of the price. Phased then tracks each phase on its own. You can also split a simple project later. All the hours you already logged move to the first phase.

  1. 01 Modelling €2,100 30h at €70/h The product modelled from drawings and reference photos.
  2. 02 Lighting & materials €2,100 30h at €70/h Surfaces, studio light, and the camera angles in the brief.
  3. 03 Final renders €2,100 30h at €70/h Every agreed angle, rendered at full resolution.
  4. 04 Delivery €700 10h at €70/h Exports, formats, and handing over the files.
€7,000 across 4 phases · 100h of work at €70/h Name the phases to fit the job: modelling, drafts, workshops, or anything else.

Keep out-of-scope work separate from the agreed price.

When a client asks for something the quote did not cover, mark those time entries Out of scope. In this example, the fourth camera angle took 4 hours. Those hours stay in your records, but they no longer count towards the 30-hour budget for Lighting & materials.

You can price the extra work at an hourly rate or as a fixed amount. You can then show it on a Phase or Project Report as Additional Work, or leave it off. A report never changes after you create it, so a report you already sent keeps its figures.

Common questions

Can I use Phased if I only bill by the hour?

Yes. If you leave the budget empty, a project's value is your hours multiplied by your rate. Hourly projects work on Free, at your Default rate, for up to three active projects. A Time Report shows the client the hours. CSV and JSON exports are included.

I quote fixed prices. How do I know if a job paid off?

Enter the price as a money budget. Phased divides the price by the hours you log on the agreed work, so you see your effective rate while the job is still open. The rate starts high and falls as you log more hours. If you finish in fewer hours than planned, it stays above your usual rate. If the job takes more hours than planned, it drops below your usual rate, and the budget health moves from On track to Approaching to Over budget.

Some jobs are hourly and some are fixed price. Can I mix them?

Yes. You choose per project, and per phase inside a phased project. One project can be hourly with no budget while the next has a fixed price. In a phased project, one phase can carry a price while another has no budget.

Do I have to split every job into phases?

No. Most small jobs stay simple: one project, with one price or none. Split a job when it has parts you want to watch on their own, such as research, drafts and revisions. You can split a simple project later without losing its hours.

Do I need to install anything, and does it work on a phone?

There is nothing to install. Phased runs in the browser on a computer or a phone. On a phone, the calendar shows one day at a time. Press and hold to add an entry, tap an entry to edit it, and start the timer from the dock.

What happens to my projects if I go back to Free?

Nothing is deleted when you move to Free. Every project keeps its phases, hours, reports, and history. Free supports three active projects; the rest are archived after a short grace period, and you can swap which three stay active. Pro-only settings such as money budgets are kept but hidden until you return to Pro, while CSV and JSON exports remain available.

One person, one price.

Free includes the calendar, timer, three active projects with two phases each, tasks, time budgets, Time Reports, and data exports. Pro is €7 a month or €66 a year. It removes the project and phase limits and adds money budgets, budget health, effective rates, priced Additional Work, Phase and Project Reports, and your own letterhead.